An in-depth look at the assembly, replacement, and commissioning of circular knitting machines—assembling a circular knitting machine begins with the frame. Place the base horizontally on a dedicated foundation and repeatedly calibrate the four support points with a spirit level to ensure the levelness error of the entire machine is controlled within 0.02 mm/m; this is the foundation for all subsequent precision. Next, install the lower needle cylinder and the upper needle dial; their concentricity must be strictly aligned, usually with the aid of a dedicated centering fixture together with a dial indicator for inspection, and the radial runout must not exceed 0.03 mm. After the needle cylinder is secured, assemble the knitting elements of each feed in sequence—needles, needle butts, cam boxes, and yarn guides. Each feed must be aligned one by one according to the process parameters; do not rush and neglect the verification of individual feeds.
When replacing components, follow the principle of "loosen first, tighten later, and alternate diagonally." For example, when replacing needles in the needle cylinder, first stop the machine and cut off the power, lock the safety pin, then use dedicated tweezers to remove the old needles one by one, check the needle slots for burrs or accumulated dirt, clean them, insert new needles of the same specification, and confirm that the needle butts fall completely into the cam track. When replacing cam blocks, record the original shim thickness, and after installing the new part, re-measure the clearance according to the original data to avoid changes in stitch depth that could cause horizontal barré on the fabric. Whenever transmission gears or timing belts are replaced, be sure to recalibrate the phase angle to prevent asynchronous yarn feeding among feeds.
The commissioning stage is key to the performance of the entire machine. First carry out a no-load run, gradually increasing from low speed to the rated speed, listen for abnormal noises, and observe whether oil supply at each lubrication point is smooth. Then thread the yarn and conduct a trial knitting, knitting about one meter of fabric with standard yarn, and check whether the stitches on the fabric surface are uniform and whether there are dropped stitches, holes, or thick and thin places. If poor loop formation is found at a certain feed, slightly adjust the high-low position of that feed's yarn guide and the needle-pressing depth of the cam; each adjustment should be small, and a trial knitting should be carried out immediately after adjustment for verification. Finally, use a tachometer to check the actual speed against the set value, and record each process parameter to form a commissioning file for future maintenance traceability. Acceptance of the entire machine after assembly should likewise not be neglected. Before formal delivery to production, a continuous running test of no less than two hours should be carried out, during which current, oil temperature, and vibration values are recorded at regular intervals to confirm that the main motor load is stable and the temperature rise of each transmission bearing does not exceed 35°C above ambient temperature. At the same time, use a feeler gauge to recheck the clearance between the needle cylinder and the needle dial to ensure that it remains within the process allowable range under hot conditions, avoiding hidden risks of needle rubbing or needle collision in later operation due to thermal expansion.
In daily maintenance, establishing an inspection ledger is an effective means of extending equipment life. Before starting the machine each shift, check whether the ceramic eyes of each yarn guide are worn and whether the yarn path has accumulated lint; once a week, blow-clean the cam boxes and needle slots; once a month, use a torque wrench to recheck the tightening status of key bolts. Particular attention should be paid to the smoothness of the oil circuit in the lubrication system; the oil level in the needle cylinder oil cup should remain between the scale marks, and the lubricating oil grade must be consistent with the manufacturer's recommendation. Do not mix oils of different viscosities, otherwise it is easy to cause oil circuit blockage or carbon deposits in the needle slots.
In addition, the operator's awareness of standards directly affects whether the results of assembly and commissioning can be maintained over the long term. When changing yarn, cleaning the machine, and handling broken needles, the shutdown and power-off procedure must be strictly implemented, and it is strictly forbidden to reach into the needle cylinder area while the machine is running. For the process parameters recorded in the commissioning file, any change should be annotated with the reason and date to form a traceable change record. Only by combining fine assembly workmanship, standardized replacement procedures, and continuous commissioning verification can the circular knitting machine stably produce high-quality fabric and truly leverage its advantages of high speed and high efficiency.